Technical Methodology

Subsurface certainty through integrated geophysical imaging

In situ measurements conform to ASTM and international geotechnical survey protocols, eliminating the blind spots between drill holes.

Data Cycle

Four-stage acquisition workflow

01
02
03
04

Survey Grid Design

Field Data Acquisition

Inversion Processing

Geotechnical Integration

Station intervals and array geometry tailored for targeted depth-to-bedrock and void detection.

Deployment of calibrated geophone arrays and electrical resistivity tomography lines under strict QA/QC.

Translation of raw acoustic velocities and apparent resistivity into actionable lithological boundaries.

Cross-validation of inversion models against physical core sampling data to deliver absolute structural certainty.

Survey Modalities

Core geophysical profiling methods

Electrical

Electrical Resistivity Tomography

High-density multi-electrode profiling mapping subsurface lithology, fault zones, and water table depths with millimeter-level survey accuracy.

Acoustic

Seismic Refraction & Downhole Shear

Active source seismic profiling measuring compressional and shear wave velocities to determine bedrock depth and dynamic elastic moduli.

Electromagnetic

Ground-Penetrating Radar

High-frequency electromagnetic profiling resolving shallow utilities, rebar distribution, and near-surface structural discontinuities.

Physical Calibration

In situ testing standards

Dilatometer
Logging
Penetration

Borehole Dilatometer Testing

Core Recovery Logging

Dynamic Cone Penetration

In situ measurement of soil and rock deformation modulus under controlled radial pressure increments.

Detailed lithological and structural logging of core samples arrayed in wooden core boxes with depth markers.

Continuous resistance profiling evaluating bearing capacity and strength variations across unconsolidated overburden.

Download method specifications and survey standards

Connect with our principal geophysicists to discuss custom array modeling or tender requirements for your upcoming project.